Updating applications for several PLCs or discarding the updates

You are able to use the resource manager to update several already loaded applications in one go. This function is also known as reloading the application or just as the reload.
At first, you will be preparing the updates – these preparations might be time-consuming. The subsequent updates of the applications will be quick and easy because they are based on the existing preparations.

Conditions for updating the applications:

A connection to the PLCs has been established.

The application has already been built for the PLCs.

The applications have already been loaded onto the PLCs.

The PLC, i.e. the corresponding platform within the PLC-object, supports the updating of the application.

How to update the applications:

  1. In the Resource Manager view: Select one or several PLCs (= appertaining IEC-resource with icon ).
    (info) Select one PLC by clicking onto it. Select several PLCs by pressing and holding the Shift-key or the Ctrl-key while clicking onto the next PLC. Or press Ctrl+A in order to select all PLCs within the resource manager. 

  2. Click  (Prepare Update). If the fingerprint in the column ID (local) differs from the fingerprint in the column ID (Generated) for the selected applications, you are able to decide whether to rebuild the applications or not.
    No matter what you are deciding, the applications are not loaded for execution onto the PLCs during this step.
    Result, if the preparations are successfully concluded: The fingerprints are displayed/updated within the column ID (Prepared) for the applications.

  3. If you clicked Yes to confirm the prompt, Neuron Power Engineer uses the current state of the application for preparing the update.

  4. If you clicked No,  Neuron Power Engineer uses the state of the application as it has already been built at a previous time.

  5. Click  (Update Application) and confirm the prompt (click Yes).
    Result: The prepared applications are loaded onto the PLC to be executed. Afterwards the fingerprints within the column ID (On Target System) are updated for the applications. At the same time, the fingerprints within the column ID (Prepared) are deleted (instead the column displays ---).

Good to know

(grey lightbulb) If you want to discard the preparations because you do not need them anymore, click  (Discard Prepared Update).
Result: The prepared applications are not loaded onto the PLC to be executed. The fingerprints within the column ID (Prepared) are deleted as well during this action (instead the column displays ---).